I am not winning. After missing a golden chance to build the new chicken coup, when the weather guys swore up and god damned down that it was going to rain and then it totally didn't, we realized that there was another string of nice days coming up.

All of my pent up frustration over the sunshine and warmth when there was supposed to rain and cold led us to decide to rebuild the coup during this supposed stretch of nice weather.* This, in retrospect, was a bad idea.

We have been working on this god damned thing for 4 fucking days and we haven't even got the plywood on the roof yet, let alone the metal roofing. It might rain tomorrow and that would be bad, also Scott has a doctors appointment at 2:30, meaning we are going to be stopping working at about 1pm. Meaning that I think we are fucked. Can you put metal roofing on in the rain? You know it's going to rain for two freaking days and then be balls fucking cold? Here is a breakdown of how our days went so far.

Day 1. Lots of optimism. Went to Lowes and got shafted on on a bunch of lumber for the framing. Got back and assembled the front wall (the hardest wall) before it got too cold. The sun sets at 4pm, so that is when we stop working. And by set we mean goes behind the god damned ridge and the temperature immediately drops by about 5 degrees like someone flipped a god damned switch.

Day 2. Wait for frost to kinda melt off before we start. Finish framing. Slightly less optimism, a lot of 'wait did I measure that right?' Decide we should pick up the OSB and sheathing for the walls. Off to Lowes again for some more price raping. Come back and it's dark.

Day 3. Decided lack of optimism. Realize we need an 8ft A frame ladder to reach the highest point on the roof. We no not have a 8ft A frame ladder. All we have are 2 sketchy as hell hand me down ladders that my father had. We put OSB on. Got the back wall completely sheathed inside and out, as well as most of the outside done. Congratulations are in order. Drive to town to buy food and ladder. Can't find a an 8ft ladder. Eat cheese cake.

Day 4. Everything goes to hell and optimism is buried at the crossroads in a shallow grave. Framed all the windows and the door. I can tell you right now, strait up, that cutting windows out of the motherfucking sonofabitch sheathing is harder than fuck all. There are not enough curse words in the whole of the English language to convey how much this sucked. Got all of the windows cut out, and one of the two vents done, but now we get to do it all over again with the OSB, which was not been fully done on the inside of the walls yet. Got the roof rafters up.

So tomorrow we have to:

Install plywood on roof, add roofing paper/tar paper/whatever the fuck it's called.

Place on the metal roofing.

Place and cut the OSB.

Sand down the areas around the doors and windows because our cuts are not perfect.

Install windows.

Paint Structure inside and out.

I think were fucked. Straight up fucked and we will be lucky to finish the roof plywood before he has to leave for the doctors. I don't think we are getting all that done in 4 hours. I think we are going to be putting the metal roofing on in 36 degree weather.

Yay.


* Nice weather meaning above 50 Degrees.